Crosskeys National School Cavan


Background: The school was built in 1978 and extended in 2007 to deal with a larger enrolment, which is now at 140 students.
Description: The older section of the school was re-wired and white boards installed in every room.The electrical work included installing new steel conduit in areas and reusing existing steel conduits. We supplied and installed a new ESB meter cabinet, complete with all distribution boards as required, socket and data outlets, sensors to control all lights in corridors, toilets and stores also installed was a class change system combined with intercom system, this allows the principal to talk to the entire school or each classroom individually .The fire alarm and burglar alarm were upgraded.
Client: Crosskeys National school , Board of Management
M&E Engineer: Michael Hetherton Engineering
It was a pleasure working with Kieran Callaghan Electrical during the renovation of Crosskeys National School. Kieran Callaghan Electrical were excellent in their completion times and standards of workmanship and I have no hesitation in recommending Kieran Callaghan Electrical for projects in the future. 
- Michael Hetherton, Engineer

